End-to-end steam infrastructure and plant O&M services. Choose from 5 tailored steam cost contract models, zero-capex BOOT setups, and rigorous daily KPI performance governance.
Most manufacturing facilities purchase fuel, deploy technicians, buy emergency spares, and hope their net steam cost stays viable. With Taranjot Energy Solutions (TESPL), you buy steam per metric tonne. Invoicing is calculated strictly from daily certified steam generation flow transmitters. Our incentives align 100% with your output: we are rewarded for reducing fuel waste, raising thermal efficiency, and maximizing boiler uptime.
Complete turnkey ownership of steam generation. TESPL takes 100% responsibility for fuel, personnel, spares, and ash handling.
Tailored operational deployment where TESPL provides skilled operating manpower and fuel supply linked to specific client KPIs.
Coal or biomass is supplied at a contracted Steam-to-Fuel Ratio (SFR) with guaranteed steam output per tonne of fuel consumed.
TESPL manages guaranteed fuel supply and deploys core shift supervisors and control engineers while integrating with client crews.
Complete new boiler plant engineered, installed, owned, and operated by TESPL on your premises with full steam guarantee.
Built-in protections documented in our institutional proposals (Slides 10, 20–25):
Building a modern high-efficiency boiler utility requires heavy upfront capital (¥15 Cr – ¥40 Cr), specialized engineering, IBR approvals, and ongoing operating risks. Under our BOOT model, Taranjot Energy absorbs 100% of the project capital, engineers, commissions, and operates the utility plant on your premises, supplying metered steam at a performance-guaranteed price.
Preserve bank credit facilities and equity for core production capacity expansion rather than ancillary steam boilers.
Contractual penalties on pressure drops, temperature fluctuations, or availability deficits ensure your factory lines never stop.
Steam purchases are treated as 100% deductible operating expenses (OpEx) with full GST input tax credit offsetting.
What gets measured gets improved. As detailed in our institutional proposals (Slides 12, 13, 19 & 28), TESPL implements a transparent, data-driven governance framework. Operating logs, fuel consumption ratios, water chemistry analysis, and availability calculations are systematically reviewed to maintain peak thermodynamic efficiency.
| Parameter Tracked | Frequency | Standard Benchmark | Action & Accountability |
|---|---|---|---|
| Boiler Uptime & Steam Parameter Compliance | Daily | Constant pressure & temperature at MS flow transmitter | Recorded continuously on DCS / SCADA shift log sheets |
| Number of Trippings & Stoppages | Daily | Zero unplanned outages during active production | Immediate shift engineer root-cause log & corrective fix |
| Downtime Due to Tripping | Daily | Resolution within pre-agreed SLA window | Tracked daily; compensated if contractual limits breached |
| Equipment Failure & Vibration Analysis | Weekly | Zero bearing overheating; baseline vibration specs | Weekly condition monitoring across ID/FD fans and feed pumps |
| Equipment Availability Review | Monthly | Calculated Phase-wise against pre-agreed PM schedule | Formal Monthly Operations Report presented to plant head |
| Safety Control & Trip Testing | At Shutdowns | 100% positive trip action on water level / high pressure | Mandatory safety checklist prior to restart after any outage |
| Full Comprehensive Safety Audit (EHS) | Annually | Zero lost-time injuries (LTI); strict audit compliance | Joint review of work permits, JSA, near-miss logs & PPE |
Schedule a plant feasibility walk-through or share your current boiler capacity and fuel data to receive our detailed commercial proposal.